As of today they have placed all the electrical, all the plumbing, and the vents have all been installed (along with the gas and electrical board in the basement). They have also placed windows in all the top floor windows and have weather stripped and placed the front door, garage door (not THE garage door, but the one to the kitchen) and the back door.

Tomorrow is inspection day for the electrical. Thursday they start putting up insulation and that will be inspected Saturday (which is when I will update again hopefully).

Unfortunately the batteries went by the time I got in the house to take pics of the electrical and the vents and such.... But what pics I did get are here: